Friday, December 19, 2008


M S M I
“Continuous Kaizen Activity”


As per requested By Mr. Wai, kindly attend Brainstorming Sessions for “Continuous kaizen Activity” as below;

Date: 19/12/08
Time: 10.30am
Venue: Production Meeting Room

Your attendant is compulsory.
“Be Punctual”

Team:-
Nada, Steven, KC Cheah, KF Hew, Hairy, Latiff, Hamidah & Choy Yeen.


Thanks & Regards,

Nada (Project Leader)

7 comments:

  1. Dear Team Members,

    Refer below Out comes for Today Brain storming / Briefing session – 1. on MSmi Kaizen Activity .

    Attendees; Nada, Hairy, Hamidah, Mr. Cheah, Mr. Hew, Mr. Latif.
    Absentees; Choy Yeen & Latif (Annual Leave)

    Agenda: Brain Storming / Briefing session-1 ( how, where, who & when to identify Waste ( Area)

    Item discussed

    1. Gain Input from every section head as per shown flow;

    BRIEF (TO ALL SECTION HEAD)
    - to have min 5 input or idea on improvement activity
    INPUT (WASTE IDENTIFY)
    - section head required to brief to leaders, operators and technician
    ANALYSE
    - gather and select input
    GEMBA (TO THE SPOT)
    - gather and selection on input
    BRAINSTORMING
    - debrief on selected improvement
    ACT (IMPLEMENT)
    - trial session
    MONITOR (PERFORMANCE)
    - monitoring according to results effectiveness
    FINETUNE
    - according to effectiveness

    2. Identify Quality issue on high rejection which caused from internal & external.



    Next follow up session -2 on Monday 22-12-08.



    Thank u,

    Regards
    Nada

    ReplyDelete
  2. Dear Team Members,

    Refer below Out comes for 22-12-08 Briefing session – 2. on MSMi Kaizen Activity.

    Team
    Attendees: Nada & Hairy.
    Absentees: Choy Yeen (Annual Leave), Mr. Latif & Hamidah ( unable to attend)
    Mr. Steven (Out station), Mr. Cheah & Mr. Hew(Acknowledged)
    Production
    Attendees: Ah May(M. Crimping), Har how (Inserting), Punitha (M.Process) & Ho (Auto Cutting)
    Technician
    Attendees: Zainal, Amir & Panner.

    Item Discussed

    Short briefing on
    - 7 – Waste description.
    - How, where, who & when to identify / determine Waste
    - Required to find / identify 5 min waste for Kaizen Activity.
    - Clarification on how to fill Waste(Muda) Finding check sheet which provided 1- copy to each represents.
    - Gather all input on coming 31-12-08 briefing Session-3.

    Next briefing session-3 on 31-12-08 at 4pm same place (PMR).

    “Attendant Team Members is compulsory”

    “Strive for MSMi”

    Thanks,

    Nada.

    ReplyDelete
  3. Dear Team Members,

    Refer below Out comes for 2-01-09 accumulate input / proposal session – 3. on MSMi Kaizen Activity.

    Team
    Attendees: Nada, Hairy, Latif, Hamidah & Choy Yeen.
    Absentees: Mr. Steven, Mr. Cheah & Mr. Hew(Acknowledged)
    Production
    Attendees: Ah May(M. Crimping), Har how (Inserting) & Ho (Auto Cutting)
    Technician
    Attendees: Zainal, Amir & Panner.


    Input / proposal by;

    1. Manual Cutting
    - trainer required to enhance effectiveness & efficiency operator in term of reduce high rejection.
    - ensure the part material adequate before run the part in term of overcome waiting time waste.
    - run the part according to proper and same material arrangement to avoid delay on setting change part.

    2. Manual Crimping
    - raise height of every poly bin which is placed on the floor at beside of work table in term of overcome movement waste.
    - production leader intend to assist Technicians during in their busy time which overcome waiting time waste.
    - trainer required to enhance effectiveness & efficiency operator in term of reduce high rejection.
    - required rack for loose ring terminal which is kept under table.

    3. Auto Cutting
    - required one place for material storage where currently in two or three place which enable to eliminate the transportation and waiting time waste.
    - training required to enhance the understanding on rejection criteria which over come defect waste.
    - ensure the part material adequate before run the part in term of overcome waiting time waste.

    4. Inserting
    - Home worker wire request to count and bundling by home worker or sub-con where it could avoid to recount and re-bundling by inserting and when wire sent to Final Qc, the wire count and bundling can be only once before proceed for inspection.


    5. Store
    - Tba.

    6. Technician
    - Request for feet feeder for those komax Gamma-311 without where it could overcome wire entangle etc which reduce down time.

    7. MSMi
    - Training required for Final QC by observing on specific high rejection rate portion.


    Kindly MSMi team require to comment on above proposal before proceed on next Meeting session – 4.


    Regards,
    Nada.

    ReplyDelete
  4. Dear MSMi Team Members,

    With below input / proposal for Kaizen activity, here I would like informed that after discussed and reviewed by Mr. Wai, We have selected Two kaizen Activity i.e. for;
    - required rack for loose ring terminal which is kept under table (Manual Crimping). Minor
    - self setting by operator for machine kodera (Tyco) without guide by Technicians (Auto Cutting). Major

    Team member corporation is highly required to successful the Continuous Kaizen Activity.

    Thanks,

    Nada.

    ReplyDelete
  5. Dear Team Members, Production Supervisors,Purchasing, Admin & Marketing representative & Technicians.


    As per requested By Mr. Wai, kindly attend “Continuous kaizen Activity” meeting Session-4 as below;

    Date: 14/01/08

    Time: 3.30pm

    Venue: Conference Room

    Your attendant is compulsory.


    “Be Punctual”.

    “Kaizen The Right Moves…..”

    Thanks,
    &
    Regards
    Nada.

    ReplyDelete
  6. Team
    Attendees: Nada, Hairy, Latif, Hamidah & Choy Yeen, Mr.Steven, Mr.KcCheah & Mr.Kf Hew
    Production
    Attendees: Ah May(M. Crimping), Har how (Inserting) & Ho (Auto Cutting)
    Technician
    Attendees: Zainal, Amir, Panner & Mr.AH Loy.

    The Out comes Minute meetting sessions-4.

    Mr. Wai requested every department to come out with more reliable ideas for Kaizen activity which could contribute in reducing the high rejection and cost saving.

    Next followup meeting on 02-02-09 at 3.30pm

    Attendants are compulsory.

    Thanks,
    Nada

    ReplyDelete
  7. Deer Peers,

    Please refer below stated Kaizen details activity which verify and aggred by Mr.Wai.


    Detail Of Kaizen Activity

    Section - Manual Cutting & Crimping
    1. Waste - Waiting time waste & defect waste Pic: Ah May, Leaders & Technician
    Muda Descr - Insufficient training and awareness at operator. Leader waiting for Techinician during change part which caused down time.
    Improvement Activity - Technician train Leader & operator in enhance productivity. (Conduct rotation Training)
    Impact - Enhance effectiveness, efficiency productivity & save time.
    2. Waste - Defect waste Pic: Ah May, Mr. Ah Loy, Nada & Mr. Cheah
    Muda Descr -Improper arrangment for those loose ring terminal and files which placed under the table.
    Improvement Activity-To have Pigeon hole Rack.
    Impact- to have better storage, identification and prevent mix part.

    Section - Auto Cutting / Crimping
    3. Waste- Waiting time Pic: Mr. Ho, Technician & Nada
    Muda Descr - Setting of Machine Kodera (Tyco) by two person which is caused down time.
    Improvement Activity- Self setting of Machine Kodera (Tyco) only by operator.
    Impact- save time & man power
    4. Waste- Over production & defect waste. Pic: Mr. Ho & Leaders
    Muda Descr- Insufficient training and awareness at operator.
    Improvement Activity-Leader train Operator (Conduct rotation Training)
    Impact- Enhance effectiveness, efficiency productivity & save time.
    5. Waste- Movement, waiting, transportation & defect waste. Pic: Mr. Ho & Leaders
    Muda Descr- No material handler to prepare and ensure material in work place.
    Improvement Activity - Assign material handler (use existing leader) to prepare and ensure material in work place.
    Impact - save time.

    Section - Manual Process
    6. Waste- Waiting time & movement waste Pic: Ms . Choy Yeen & Leaders
    Muda Descr - Currently Stripping & trimming process by 2 operator in different station.
    Improvement Activity - Combine Stripping & trimming process to 1 station by 1 operator instead of 2 operator.
    Impact- save time & man power
    7. Waste- Defect waste Pic: Ms . Choy Yeen & Leaders
    Muda Descr- Insufficient training and awareness at operator.
    Improvement Activity - Leader train Operator (Conduct rotation Training)
    Impact- Enhance effectiveness, efficiency productivity & save time.

    Section - Inserting
    8. Waste - Waiting time waste. Pic: Mdm. Hah Ho & Leader
    Muda Descr - Improper arrangment for rework wire segregation and distribution to respective involved
    home worker and in-house section.
    Improvement Activity - Requires to assign a leader (existing man power) to take incharge for rework wire
    segregation and distribution to respective involved home worker and in-house section.
    Impact - save time.

    Section - Store
    9. Waste - Movement waste Pic: En. Latif
    Muda Descr - The material distribution to Auto-Cuttting 2 times per day by 2 person instead 1 person
    Improvement Activity - Distribute the material 2 times per day by 1 person.
    Impact- reduce man power.

    Section - Engineering
    10. Waste - Waiting time waste Pic: Pn. Fiza, Mr. Ah Loy, &Technicians
    Muda Descr - Technician Auto & Manual inadequate familiarize at all exsisting machine.
    Improvement Activity - Senior Technician Auto or Manual require conduct rotation training to familiarize
    at all exsisting machine.
    Impact - reduce work hours & down time.
    11. Waste - Waiting time waste. Pic: Pn. Fiza, Mr. Ah Loy, &Technicians
    Muda Descr- Insufficient of training on machine handling awareness.
    Improvement Activity -Technicians conduct Training for operators.
    Impact- reduce down time & rejection.
    12. Waste - Waiting time waste. Pic: Pn. Fiza, Mr. Ah Loy, &Technicians
    Muda Descr- Each spacer for applicator of Machine Kodera requires to measure before insert into applicator due to several of sizes.
    Improvement Activity- Fabricate the cantainer Jig according to spacer sizes for better arrangement and handling
    Impact- save time.

    Section - QA
    13. Waste- defect waste Pic: Ms. Hamidah & Ms. Norma
    Muda Descr- Insufficient training and awareness at operator on the new parts.
    Improvement Activity - Conduct rotation Training (Twice Per Year).
    Impact- Enhance effectiveness, efficiency productivity & save time.
    14. Waste- Transportation & waiting time waste. Pic: Ms. Hamidah & Mr.Sahul
    Muda Descr- Barcode Label were print in Qa Dept instead print in Packing Dept.
    Improvement Activity - Requires to move Barcode printer to packing and reprogram the computer accordingly.
    Impact- save time.
    15. Waste- Process waste Pic: Ms. Hamidah & Ms. Annathi
    Muda Descr - Iniatialy the incoming inspection record in rough paper and later re-write on IQC check sheet during inspection on the material.
    Improvement Activity - Requires to use IQC check sheet directly instead record in rough paper.
    Impact- save time.

    Section - Purchasing
    16. Waste- Inventory waste Pic: Ms. Lai
    Muda Descr- Excess inventory stock
    Improvement Activity- Reduce inventory stock by monthly and stock monitoring for value
    Impact - save time, cost & space.

    Section - Marketing
    17. Waste- Inventory waste Mr. Steven
    Muda Descr- Excess inventory for finish good & wires /work in process
    Improvement Activity- Inventory monitoring for finish goods & wires /work in process.
    Impact - save time, cost & space.

    Section - Personel & Admin
    18. Waste - Other waste Pic: Mr. Sahul & Mr.Nik
    Muda Descr - Replace the Corporate ADSL Broadband to normal SOHO ADSL Broadband, with router setting the internet request load could
    be rerouted to the existing SDSL connection, only the download bandwidth used for the SOHO connection
    Improvement Activity - Eliminate One ADSL Broadband from Two.
    "Impact - Cost – save RM400/mth,
    need some scheduled internet access for certain dept. to obtain highest bandwidth speed,
    Maybe need to restart the router/proxy more than once per day,

    "
    Very high load during SDSL broadband failure, Some port need to rerouted to enable external application access & External IP address change.
    19. Waste - Indirect kaizen Pic: Mr. Sahul & Pn. Rohilah
    Muda Descr - The locker without any label Identity of employee.
    Improvement Activity - Indentity Employee Requires to label on each locker for better indentification
    Impact - To have better identification for each locker without have any complication in identify.

    Section - Engineering (Sample)
    20. Waste- Movement & defect waste. Pic: Hairy & Panner
    Muda Descr - Current sample making work table as in sitting work table condition.
    Improvement Activity- Raise height of work table from sitting to standing condition.
    Impact - able to have comfortable work place, reduce movement & defect waste.

    ReplyDelete